MTL provided process and mechanical design, project management and commissioning services for the containerised unit to maintain Cl2 residual due to initial low water demand. The system included the following features:
MTL worked very closely with Filtration Technology, the Siemens dosing equipment supplier and installation contractor to ensure the dosing unit met the high standards required.
Ergo Consulting Ltd (Electrical & Controls) and Filtration Technology/Kinetic/PLNZ